Potholing Xcel gas before bore pit at US-34
Paint conflicts near highway approach — hydro-vac exposes gas without damage, depth recorded before casing enters ground.
Greeley, CO · Weld County
Hydro and air vacuum excavation in Greeley — potholing Xcel, Greeley water, and carrier fiber before HDD rigs open pits along US-34 and US-85.
Vacuum excavation in Greeley pothole-exposes Xcel gas lines, Greeley water mains, carrier fiber, and irrigation laterals before HDD and auger boring rigs approach pit locations. Paint-and-probe conflicts on Greeley's Downtown and UNC campus grids get confirmed by vacuum pothole before rod enters ground.
Sandy loam on most residential grids responds well to air-vacuum in dry conditions; clay pockets on Downtown lots may call for hydro. Oil-field corridor adjacency on north Greeley edges adds pipeline company coordination before any vacuum excavation near transmission infrastructure.
South Platte alluvium near the river excavates efficiently with hydro but requires wet spoil management. We arrive with tank capacity and soil handling matching the specific Greeley alignment.
Real Weld County angles — not generic statewide copy.
Paint conflicts near highway approach — hydro-vac exposes gas without damage, depth recorded before casing enters ground.
Air-vac slot around buried valve box — debris removed to tank without disrupting neighboring utilities.
Sandy loam pothole grid — air-vac confirms depth and separation before HDD crew stages.
Hydro-vac confirms utility depth and offset before bore profile is finalized for river-adjacent crossing.
Greeley vacuum crews arrive with 811-cleared marks. Air-vac for sandy loam and dry conditions; hydro for Downtown clay and South Platte alluvium. Depth logs and utility offsets documented for engineers and permit submittals.
Weld County sandy loam, expansive clay pockets, and South Platte alluvium near the river — ag-field fill on newer subdivision grids.
Greeley bores hit sandy loam on most residential grids, South Platte alluvium near the river, and expansive clay pockets on older downtown lots. Ag-fill subdivisions may hide structural debris that stalls reaming. We size mud for Weld County sandy soils — not metro Denver clay templates.
Eastern plains wind, summer heat, and spring hail push Greeley crews to plan lightning holds on exposed agricultural-edge pads.
Spring South Platte runoff raises groundwater on river-adjacent alignments. Summer wind and lightning affect exposed agricultural-edge pads. We plan seasonal windows with your schedule.
City of Greeley Public Works, Weld County ROW, CDOT US-85 relocations, South Platte floodplain on east alignments.
City of Greeley Public Works handles permits inside city limits; Weld County ROW applies on outer edges. CDOT controls US-34 and US-85 state bores. South Platte floodplain work may need additional review. Oil-and-gas corridor adjacency may trigger pipeline company coordination.
Potholing with vacuum versus hand-digging protects Xcel gas and Greeley water mains in congested UNC campus and Downtown grids — a shovel strike triggers utility outage and PHMSA reporting.
Length, diameter, groundwater, environmental windows, flagging, engineering, inspection.
You share plans or describe the problem; we confirm alignment, depth, access, and which trenchless method fits Colorado soils.
Colorado 811 ticket filed; wait period before pits open unless your permit path differs. We pothole where marks conflict.
Bore plan, CDOT or city ROW permits, railroad agreements, and crossing engineering when the path leaves private property.
Compact spread for tight Boulder lots; larger HDD for I-25 or I-70 relocations — matched to length and diameter.
Steered pilot on design line, ream passes sized for your pipe or casing, fluid program tuned for clay or sandstone.
HDPE fusion, steel casing, or multi-duct bundle pulled with tension and bend-radius monitoring.
Pressure test, mandrel, or survey records for owners, inspectors, and operators as spec requires.
Compact pits, replace sod or hardscape per scope, leave 811 ticket and locate map in your project file.
Hole count, depth, soil type, spoil disposal, and mobilization — call for Greeley estimate.
Air-vac in dry sandy loam; hydro for Downtown clay and wet South Platte alluvium.
Yes — same day when schedule allows.
Yes — with pipeline company coordination before mobilization.
Yes — depth, offset, and utility type documented for engineers.
24/7 — Emergency dispatch statewide. Tell us entry, exit, pipe size, and county — a bore specialist calls back with cost drivers, not a flat rate.
Scope your alignment
Step 1 of 2 — path, pipe, and city first